Concrete ramp repair under way for $670M Mississippi River Bridge

02/11/2013 | St. Louis Post-Dispatch

Fred Weber is replacing concrete along an estimated 0.25-mile stretch of a ramp section for the $670 million Mississippi River Bridge project. The work is a result of the Illinois Transportation Department's discovery of a missing cross-slope on the curving ramp's surface. "The outside of the curve was not high enough," said Jeff Church, the Illinois DOT's implementation engineer for the East St. Louis area.

View Full Article in:

St. Louis Post-Dispatch

Published in Brief: