Video brings Boston's Longfellow Bridge construction stages to life

03/7/2013 | BostInno (Boston) · YouTube

A video from the Massachusetts Department of Transportation shows how work on the Longfellow Bridge that connects Boston to Cambridge in Massachusetts will be finished in six phases. "Our projects are complex and lengthy and the rehabilitation of the historic Longfellow Bridge is no different," said Sarah Lavoie, a spokeswoman for the state Department of Transportation. "It can be difficult to visualize the end result, and this video brings all construction stages to life." The project is expected to be completed in 2015.

View Full Article in:

BostInno (Boston) · YouTube

Published in Briefs: