Deficient concrete leads officials to examine options, bond terms for pedestrian bridge in Canada

04/18/2012 | Ottawa Citizen (Ontario)

A problem with concrete means that a tower that is part of a pedestrian bridge in Canada is likely to be torn down and rebuilt. The city holds a performance bond for the $5 million bridge project, according to a local official. Work on the bridge was originally supposed to be completed by the end of next month.

View Full Article in:

Ottawa Citizen (Ontario)

Published in Brief: