Contractors fix construction problems on Sakonnet bridge

Design errors and poorly placed concrete on Rhode Island's new Sakonnet River bridge have the state Department of Transportation keeping close watch over the project. However, it appears the issues aren't grave enough to delay the project or raise costs significantly. The flawed concrete will be drilled out and replaced, while the bridge girders will be reinforced before being installed.

View Full Article in:

Providence Journal (R.I.) (free registration), The

Published in Brief: