12/27/2012

HNTB will be the owner's engineer for the $3.14 billion Tappan Zee Bridge project, according to the New York State Thruway Authority. The design will require 964 piles and about 275,000 cubic yards of concrete. A challenge for the project will be the soil composition in the Hudson River.

Related Summaries