A second batch of six pontoons was floated out in Aberdeen, Wash., on Monday for the SR 520 floating bridge project in Lake Washington. A total of 77 bridge pontoons will be built for the project. The latest six pontoons will be inspected and towed to the bridge site when needed.

Related Summaries