4/10/2013

A project to replace the leaky, 10-year-old roof at the Mount Solo Middle School in Longview, Wash., will cost about 69% less than estimated. The initial estimate was $1.1 million, but the Longview School Board has accepted a bid of $345,599 from Pacific Tech Services. The undertaking involves replacing the snap-lock metal roof with a membrane roof system, and repairing the roofs on three sections of the school building.

Related Summaries