The site-engineering subcontractor for a planned $42.4 million addition to Greenwich High School in Connecticut says it is moving in the "right direction" to obtain a performance bond for the project. Securing the bond is considered crucial because of the disparity in bids and the potential for an increase in the project cost.

Full Story:

Related Summaries