Port operator Eurogate has installed a 2.4-megawatt wind turbine to meet the needs of its container terminal at the Port of Hamburg in Germany. The Nordex N117/2400 turbine is also expected to cut 4,600 metric tons of carbon dioxide from the air per year.

Full Story:

Related Summaries